Process Plus performed the conceptual engineering and limited detail design engineering for a project to limit toluene emissions below 10 tons per year for a chemical plant in northeastern Illinois. The customer was also interested in recovering as much solvent as possible, with a resultant reduction in raw material and / or overall operating costs, as a means of offsetting the investment expense related to executing the project.
System Includes
- Vent Condensers
- Glycol Chiller
- Carbon Adsorption Canisters
- Truck & Rail Car Loading / Unloading Connections for Vapor Recovery
Services Provided
- Concept Development
- Process Definition Engineering
- Detail Design Engineering
- Procurement Services
- Expediting
- Equipment Documentation
- On-site Construction Management
|
$2.5 million
February 2006 – August 2006 Conceptual Engineering & Design
September 2006 – February 2007 Procurement & Construction Support
Operational February 2007
|